WebBreaking-the-tape method is good to measure distance especially uneven or sloping grounds. This method will not give accurate as what instruments such as theodolite and total station will give, since it is prone of errors especially if the tape is not parallel with the ground or the rods are vertically erect. WebQuestion: TAPING ON SLOPING GROUND OBJECTIVES: • To develop the skills of determining the horizontal distance of a sloping ground by breaking the tape method up and down the slope. To acquire the skills of determining the horizontal distance of a sloping ground by using the tape and the Abney hand level. INSTRUMENTS: 1. 2 range poles 2. …

4 Distance Measurements - Indiana

WebFrom the lab report "Taping Over Uneven Ground", the purpose of the experiment was to measure horizontal distance on a sloping ground using a tape. The designated area had … WebTaping as a primary accurate distance measuring method has largely been replaced by electronic and satellite-based methods. Because of that, this section presents only a general overview of the process. Most surveying text books describe the procedure in much more detail if the reader is interested. location of bridgestone arena https://hallpix.com

Exer6-Taping Over Uneven and Sloping Ground PDF Fraction

WebYou should always measure distances as horizontal distances. You may have to measure on ground which has no slope, or only a very small slope that is less than or equal to 5 percent (see Section 4.0). The distance measured on this type of ground will be equal to or very close to the horizontal distance. When the slope of the terrain is greater ... WebNov 3, 2014 · [7]FIELD WORK NO.3 TAPING ON SLOPING GROUND CONCLUSION On this field work, we try to determine the horizontal distance of a sloping ground by using … WebAfter the field data is recorded, make an actual taping of the two points A and B to determine the taped distance (TD). 5. Assuming your pace factor (PF) is already determined to be 0.635 m/p in the previous exercise for level ground. Formula for solving the pace factor (PF): Taped Distance PF= Mean No . of Paces TD meters PF= =m/ p Paces Table 1. indian organic skin care brands

Field Work No.3 - Taping On Sloping Ground (Revised)

Category:Taping over uneven ground - Lab Report Example

Tags:Taping on sloping ground conclusion

Taping on sloping ground conclusion

Chapter E. Taping

WebOne way of combating subsidence and hence cracking is careful construction of houses by isolating them from trees, mines and unstable ground to reduce risk of such uneven … WebThis experiment is conducted to measure a horizontal length of a line on an uneven/sloping ground by breaking tape. II. Objectives 1. To measure the horizontal length of a line using a measuring tape over an uneven and sloping ground by breaking tape 2. To acquire an acceptable relative precision of the measured horizontal length of a line. III ...

Taping on sloping ground conclusion

Did you know?

WebIn the slope taping method , the slope is held as required by the slope of the ground, the slope of the tape is measured and the horizontal distance is computed. In the horizontal taping method, the tape is held horizontally and the required graduation is projected on the ground with a plumb bob. Slope Distance True D = Cos a (slope D) WebTAPING OVER SMOOTH, LEVEL GROUND When the ground is fairly smooth and the ground cover vegetation is light and low, the effort required to measure the distance between …

WebThe direct and indirect methods of finding horizontal distances on sloping ground are given below: 1. Direct Method (Stepping Method): The method consists in measuring the line in short horizontal lengths called steps. Suppose it is required to measure the horizontal distance between the points A and B (Fig. 2.19). WebTAPING ON SLOPING GROUND. OBJECTIVES: To develop the skills in determining the horizontal distance of a sloping ground by breaking the tape method up and down the slope. To acquire the skills in determining the horizontal distance of a sloping ground by using the tape and the Abney hand level. INSTRUMENTS: 2 range poles or equivalent

Web2. The rear tape man with one pin station himself at the point of beginning. At the end tape man takes the zero end of the tape and advances towards the other end of the line to be measured. 3. When the head tape men has gone nearly a full tape length, the rear tape men calls “tape” to stop the head tape men. WebA. Taping on a Plain Level Ground 1. The professor assigns the accessible and unobstructed course to be measured by the student on a level ground by about 50 paces. 2. The Chief of Party marks the end points by a chalk if it is on pavement or by a 3 common wire nail (c.w. nail) if it is on soft ground and designates it as end points A and B. 3.

WebUniversity of Memphis

indian origin footwear brandshttp://www.vermessungsseiten.de/englisch/vermtech/taping.htm location of brentford football clubhttp://www.ce.memphis.edu/1101/notes/surveying/Surveying_2_distance.pdf indian origin cricketers in west indiesWeb1Field Work No. 3 [TAPING ON SLOPING GROUND] CONCLUSION Based on my own observation to get more accurate results you need to measure the slope slowly and carefully to obtain better results. You may also measure along the ground on a slope. indian origin clothing brandsWeba) On a designated uneven and sloping terrain, mark the ends of a line to be measured. Designate the mark at the bottom of the slope as point A and at the mark at the upper portion to serve as markers, or are set at intermediate points along the line to insure better alignment during taping. location of bristol in the ukWeb“lining in” when one is taping or measuring angles, Figure 12.6. 12.3.3.5. Plumb Bobs Plumb bobs with 6 to 10 ft of cord attached are used when measuring horizontal distances on sloping or irregular ground to transfer the distance from the horizon-tally held tape to the point on the ground. They also are attached to a surveyor’s indian origin hollywood actorsWebTaping ON EVEN OR Level Ground and Taping ON Uneven OR Sloping Ground. Field Surveying Laboratory 100% (26) 5. Taping ON EVEN OR Level Ground and Taping ON Uneven OR Sloping Ground. Field Surveying Laboratory 100% (26) Taping ON EVEN OR Level Ground and Taping ON Uneven OR Sloping Ground. English (US) United States. indian origin online shopping company